Yesterday one of the causeways of clay was broken through to move towards completion of the island. The pictures below show the progress of this exciting piece of landscape work.

boating-pond-extension-and-island-post-breakthrough-7th-sept-2016-3

boating-pond-extension-and-island-post-breakthrough-7th-sept-2016-1

boating-pond-extension-and-island-post-breakthrough-7th-sept-2016-6

Water levels in the pond will drop temporarily as water floods the channel around the island, but these will soon return to normal with some rainfall.

The reed plants will now be planted around the island, with gaps left to allow for fishing and Model Boating.

Advertisements
This entry was posted in Construction, Environment, Programme, Uncategorized and tagged , , , . Bookmark the permalink.

One Response to Break through at the island

  1. Pingback: Progress update | Hampstead Heath Ponds Project

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s