Progress update

Work at Model Boating Pond continues to progress well as more clay is placed on the new dam.

IMG_6368

The borrow pit is also getting deeper as the clay for the new dam is excavated.

IMG_6329

Borrow pit at Model Boating Pond

The silt which will fill up these borrow pits is drying out well in the work compound.

IMG_6339

Drying silt

IMG_6307

Drying silt

At Stock Pond the grass planted on the downstream slope is emerging. This area is now finished other than turfing which will take place in May.

IMG_6321

Stock Pond

At Catchpit, excavations for the pipe which will run through the new structure are well underway.

IMG_6352

Catchpit

Now the fence has been completed at Mixed Pond, clay is being placed to raise the causeway up.

IMG_6356

Mixed Pond

Work continues on the outlet structure at Hampstead No. 2. The steel reinforcements are in place and a concrete pour will follow.

IMG_6358

Hampstead No. 2

And finally at Hampstead No. 1, the labirynth weir is almost finished, and clay has now been placed over the top of the concrete structure.

IMG_6364

Labirynth weir at Hampstead No. 1

Advertisements
This entry was posted in Construction, Programme, Uncategorized and tagged , , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s