On the right path

Regular Heath visitors will have noticed the footpaths on the Heath have been deteriorating due to the heavy traffic associated with the Ponds Project. The paths have been built with pedestrians, and the occasional Heath vehicle, in mind and were not strong enough to take large construction vehicles. This was identified at the beginning of the project, and at the end of the construction phase, all the paths will be reinstated.

In the meantime, BAM Nuttall have designated a path repair team who are out and about repairing damage to verges and filling in potholes where ever they can.

IMG_5526

BAM’s path repair team in action

Advertisements
This entry was posted in Construction, Uncategorized and tagged , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s